FAQ’s

FAQ’s2017-12-06T15:37:15+00:00

Brick & Block Laying FAQ’s with Marshall Profiles®

Is the Slider hard to move along the Profile?2017-12-06T15:54:14+00:00

If the Slider is sticking when moving it along the Profile, a touch of oil on the Profile runners will ensure they slide freely. See Video if you need more info.

Building From A Base That’s Not Level?2018-03-27T09:02:16+01:00
Uneven Foundation

Foundation Not Level

Correct The Foundation Level

Correct The Foundation Level

 

  • Lock in the profile at the lowest point of the foundation, with a height notch set at the standard correct height (225mm For standard UK Block)
  • Set up the far end, use a water or laser level to align the notches between the 2 profiles so they’re in horizontal alignment. (Note; the 1st notch is set at 50mm on one end of the profile and 25mm on the other end, this allows for greater flexibility when setting up and facilitates getting perfect levels. The notches are 75mm apart (between) thereafter.
  • Attach the string line & correct the irregularity by cutting the initial course of blocks.
Marshall bricklaying profiles

Marshall Profiles – Build Walls

Marshall bricklaying profiles

Marshall Profiles = Perfect Build

Do I have to disassemble the Profiles between jobs?2016-10-19T08:59:56+01:00

No – you can fold up for transport and storage. This makes it very quick to start the next job. See illustration.

Profile Storage
Can the Profiles be used to build a two storey?2016-10-19T08:59:56+01:00

They certainly can see images below (Images courtesy of Andrew Keeler)

Are Marshall Profiles Sold As A Pair?2016-10-19T08:59:56+01:00

Yes, 1 Set contains 2 corner profiles.
Marshall Profiles

Can I Ignore The 75mm Course Notches?2016-10-19T08:59:56+01:00

The builders line can be tied off on the slider or line ties without wrapping around the Profile and there-by ignoring the 75mm spaced notches on the Profiles.

Off-Standard_Wall_Courses

How Do I Setup For Building An Extension?2016-10-19T08:59:56+01:00

Use the Extension Fixing Brackets, these eliminate the need to use the stay bars. Setup is simple and fast.

Building_An_Extension

How Do I Use To Build Walls With Pillars?2016-10-19T08:59:57+01:00

Using Marshall Profiles facilitates precise pillar and wall construction.

Building walls with Pillars

Pillars-FAQ

 

Should I Support The Profiles When Pulling High Up?2016-10-19T08:59:57+01:00

It’s recommended to use the slider as a support when pulling high up, spares can be purchased but also remember the String Line can be tied off independently of the slider using our new Plastic Line Tie Off’s. This allows the slider to be used solely as a corner supporting instrument – support to the profile when pulling high up.
Profiles_support_Highup

How Long To Deliver My Order?2016-10-19T08:59:57+01:00

We aim to deliver all UK & Ireland orders within 2 working days from time of purchase (Up To 4PM Ea. Day), Western Europe 3 working days. Other Countries may vary but all orders are dispatched on a timely manner and delivered via traceable courier service. We work from our warehouses in Shannon, IRE & Clacton On Sea in the UK.

DHL

Title

Go to Top